Page 11 - Tạp chí bonsai cây cảnh BCI 2016Q3
P. 11
CASE II SECOND PHASE OF FORMATION
Front, Right Side, Left Side and Back of
tree is shown before and after work.
It has been quite a few years since I initially shaped
this tree. The main branch structure was set, but for
particular circumstances, no follow-up work in terms
of shaping and maintenance were performed.
During the last couple of years, this specimen has
occasionally been pinched and numerous erratic
growth has appeared, thus ruining the original design
plan.
Fortunately, with minor pruning, we are able to find
solutions and rectify the order in the design.
To achieve harmony with the mighty trunk, styling
work has to be diligent.
Once construction of the main branch structure is
concluded, we will enter the third phase of style work;
the creation of foliar masses and refinement work. In a
couple of years, this tree will be show ready, displaying
all its potential and splendor.
With this case, we wish to explain all details concerning
the second phase of construction. We have the benefit
of having concluded the foundation of the main
branch work and must complete the consolidation of
foliar masses and refinement work, all in accordance
with our final design.
Our objectives are:
• Consolidation of the secondary and tertiary
branches.
• Adjustment of volume and spacing.
• Definition of the design plan.
July/August/September 2016 | BCI | 9